Maintenance works - paved areas, Maintenance and/or calibration works - visual aids with impact on runway(s) 25R/07L, 25L/07R and 19/01 finished
from to
Closed runways
19
closed for arrivals and departures
01
closed for arrivals and departures
Expected runway use during the works
from to
arrivals
25R
25L
departures
25R
Note: Another runway configuration might be used for safety, operational or changing meteorological conditions.
from to
Closed runways
25R
closed for arrivals,
available with reduced distance for departures
07L
closed for arrivals and departures
19
closed for arrivals and departures
01
closed for arrivals and departures
Expected runway use during the works
from to
arrivals
25L
departures
25R
Note: Another runway configuration might be used for safety, operational or changing meteorological conditions.
from to
Closed runways
25L
closed for arrivals and departures
07R
closed for arrivals and departures
19
closed for arrivals and departures
01
closed for arrivals and departures
Expected runway use during the works
from to
arrivals
25R
departures
25R
Note: Another runway configuration might be used for safety, operational or changing meteorological conditions.