Maintenance and/or calibration works - visual aids with impact on runway(s) 19/01 postponed
from to
Closed runways
19
closed for arrivals and departures
01
closed for arrivals and departures
Expected runway use during the works
from to
arrivals
25R
departures
25R
Note: Another runway configuration might be used for safety, operational or changing meteorological conditions.