Maintenance and/or calibration works - visual aids with impact on runway(s) 25L/07R and 19/01 postponed
from to
Closed runways
25L
closed for arrivals and departures
07R
closed for arrivals and departures
19
closed for arrivals and departures
01
closed for arrivals and departures
Expected runway use during the works
from to
arrivals
25R
departures
25R
Note: Another runway configuration might be used for safety, operational or changing meteorological conditions.
from to
Closed runways
25L
closed for arrivals and departures
07R
closed for arrivals and departures
Expected runway use during the works
from to
arrivals
25R
departures
25R
from to
arrivals
25R
departures
25R
19
Note: Another runway configuration might be used for safety, operational or changing meteorological conditions.