Operational limitations with impact on runway(s) 25R/07L finished
from to
Closed runways
25R
closed for arrivals,
available for departures
07L
available for arrivals,
closed for departures
Expected runway use during the works
from to
arrivals
25L
departures
25R
Note: Another runway configuration might be used for safety, operational or changing meteorological conditions.