Renovation works with impact on runway(s) 25L/07R finished

from to

Closed runways

25L
closed for arrivals and departures
07R
closed for arrivals, available for departures

Expected runway use during the works

from to

arrivals
25R
departures
25R 19
Note: Another runway configuration might be used for safety, operational or changing meteorological conditions.

from to

Closed runways

25L
closed for arrivals and departures
07R
closed for arrivals and departures

Expected runway use during the works

from to

arrivals
25R
departures
25R 19
Note: Another runway configuration might be used for safety, operational or changing meteorological conditions.
icon_info Plane departing Group 7 Created with Sketch. Icon triangle warning Icon triangle left Icon triangle right Icon close Icon triangle warning Questionmark Reason meteo Reason obstacles Reason unplanned Reason planned maintenance Reason capacity exceeded Reason unavailable (non-availability) Reason special activities Reason other Search Arrow right