Operational limitations with impact on runway(s) 25R/07L finished
from to
Closed runways
25R
closed for arrivals and departures
07L
closed for arrivals and departures
Expected runway use during the works
from to
arrivals
25L
19
departures
19
25L on ATC discretion
Note: Another runway configuration might be used for safety, operational or changing meteorological conditions.